Tahiti
The aim of the project is to bury and anchor 2 fibre optic cables at around 2.50 m below sand level and therefore between 3 and 4 m below water level over a distance of 50 m from the beach.
Client:
INTEROUTELocalisation:
Tahiti - North IslandDate:
Juin 2015Difficulté:
Working in the swell!Produits Utilisés - 1:
Double slide rail parallel DGPVProduits Utilisés - 2:
Pile guide box KKPDate:
4 June 2024