Tahiti

Tahiti

The aim of the project is to bury and anchor 2 fibre optic cables at around 2.50 m below sand level and therefore between 3 and 4 m below water level over a distance of 50 m from the beach.

Client:
INTEROUTE
Localisation:
Tahiti - North Island
Date:
Juin 2015
Difficulté:
Working in the swell!
Produits Utilisés - 1:
Double slide rail parallel DGPV
Produits Utilisés - 2:
Pile guide box KKP
Date:
en_USEnglish