Var plain

Var plain

As part of the contract for the new Plaine du Var urban road, the Eiffage TP, Tama consortium is carrying out the ‘Var outlet’ work package. A major rainwater structure needs to be built between the future road and the Var, over a length of around 1,000 metres, to drain water and improve the treatment of hillside rainwater.

Contractor
TAMA - EIFFAGE
Localisation:
Nice
Scope:
The main road through the Plaine du Var
Products used on this project:
Double slide rail parallel DGPV
Date:
en_USEnglish