Peru
Contractor
Interceptor NorteLocalisation:
LimaDate:
December 2004Scope of work:
Installation of main manifold D1200mmScope of works:
Depth: 6.10mType de matériel:
DGPV 6000 parallel double slide systemProducts used on this project:
Double slide rail parallel DGPVDate:
4 June 2024


