Airport
Underground crossing of the main access to Marseille-Provence airport to transfer rainwater to the retention basin.
The main challenge: keeping traffic moving at the airport.
Contractor
Razel BecLocalisation:
MarignaneDate:
Juillet 2013Scope of work:
Rainwater drainageProducts used on this project:
Double slide rail parallel DGPVDate:
4 June 2024


